Project Update (April 2018)

Current Projects

SUCF 231001 Rehab Exterior Envelope – Dana Hall

This project is currently in Construction Phase. The scope of work includes removal and replacement of existing roofs, fascia, soffits, lighting, doors, windows, window treatments, construction of new entrance vestibules, sidewalks and landscaping.

  • Project Schedule:
    • Construction Completion Date 12/2/18

Dana Hall

SUCF PN 231002 Rehab Water Distribution System & Related Site Infrastructure

This project is substantially complete subject to punch list. The scope of work included removal and replacement of portions of the campus’ water distribution system to correct deteriorated conditions identified in campus-wide site utility study completed October 2013 including water pump system, master water meter pit, valves, backflow preventers, water mains and individual water meters.

SUCF PN 231003 Replace Roofs Cooper Service Complex & Payson Hall

This project is substantially complete subject to punch list. The scope of work included removal and replacement of existing roofs, fascia, soffits, exterior lighting, doors, windows and interior window treatments at the Cooper Service Complex as well as removal and replacement of existing roofs, fascia, soffits and exterior lighting at Payson Hall.

Cooper

SUCF 231006 Rehab Chaney Dining Hall

This project is currently in Construction Phase. The scope of work includes interior renovations of space, replacement of HVAC, mechanical, electrical and plumbing systems. Chaney Dining Hall will be closed following Commencement May 12, 2018. Temporary dining facilities will be located at Dana Hall Gymnasium for Fall Semester 2018.

  • Project Schedule:
    • Beneficial Occupancy/Construction Completion Date 12/21/18

Floor Plans and Renderings

Chaney Dining Center

SUCF 231008 Site Improvements Payson Hall North

This project is currently in Final Design / Bid Phase. Similar to Site Improvements Payson Hall East, the scope of work includes removal and replacement of deteriorated pedestrian walks, stairs, rails, and stone veneer retaining walls north of Payson Hall toward Dana Hall and Parking Lot 3.

  • Project Schedule:
    • Pre-Bid Walk Through 5/17/18
    • Bid Opening 5/24/18
    • Beneficial Occupancy / Construction Completion Date 11/16/18

SUCF 231018 Rehab Dana Hall

This project is currently in Design Phase. The scope of this project includes the interior renovation of Dana Hall, repurpose space, replacement of HVAC, mechanical, electrical and plumbing systems. Final Design / Bid Phase documents are anticipated Fall Semester 2018 with Construction Phase beginning Spring Semester 2019.

SUCF 231020 Mechanical & Electrical Systems Study – MacArthur Hall & Wicks Hall

This project is currently in Study Phase. The scope of this project is to determine the most practical and economical means of replacing existing mechanical and electrical systems in MacArthur Hall and Wicks Hall with energy efficient systems and still be able to operate the buildings during normal business hours and during academic session. A key component of this project is the Geothermal Clean Energy Challenge presented by NYPA and NYSERDA to accelerate the installation of high quality ground-source heat pump (GSHP) systems. The Geothermal Clean Energy Challenge was developed to stimulate and finance the installation of best-in-class, large-scale geothermal systems, known as ground-source heat pump (GSHP) systems. These systems reduce energy costs and greenhouse gas emissions. Increasing the use of these systems will play a major role in achieving Gov. Andrew M. Cuomo’s goal to reduce New York State’s greenhouse gas emissions 40 percent by 2030. SUNY Canton was approved as one of the first 75 candidates that will receive a free ground-source heat pump screening analysis through the Geothermal Clean Energy Challenge program. The study is anticipated to be complete Fall / Winter 2018-19.

SUCF 231023 Replace Boilers - Miller Campus Center

This project is in Design Phase to remove and replace existing boilers and related systems due to failure with new energy efficient systems. Work is anticipated to be complete October 2018.

SUCF 231024 Wicks Hall - Rehab Lecture Hall

This project was requested to renovate the interior space of the Lecture Hall located in Wicks Hall including but not limited to interior finishes, seating, technology, lighting, HVAC, mechanical, and electrical systems. The schedule is to be determined.

SUCF 231025 2018 Facilities Master Plan (FMP) Update

This project was requested to update the 2011 Facilities Master Plan; determining enrollment projections and reviewing space utilization and allocation. The 2018 FMP Update will also review capital improvements and possibly re-prioritize projects based on programmatic changes within the campus. The FMP Update will also review and assess the existing conditions of buildings/areas including Nevaldine Hall North, Nevaldine Hall South, Payson Hall, Dana Hall, MacArthur Hall and the Miller Campus Center. The schedule is to be determined.

SUCF PN 231026 Cooper Service Complex - Interior Renovations

This project is currently in Final Design Phase. The scope of work includes interior renovations of space, replacement of mechanical, electrical and plumbing systems. The Bid Phase and Construction Phase schedule is to be determined.

DASNY 341840 Rushton Hall - East Wing Rehab

This project is currently in Construction Phase. The scope of the project includes interior renovations of space, replacement of HVAC, mechanical, electrical and plumbing systems in the East Wing of Rushton Hall. Work is scheduled to be substantially complete August 2018.

  • Project Schedule:
    • Beneficial Occupancy / Construction Completion Date 8/3/18

L23101 CARC – Existing Building Commissioning (EBx)

Existing Building Commissioning (EBCx) is currently ongoing at the CARC. EBCx is a systematic process for investigating, analyzing, and optimizing the performance of building systems through the identification and implementation of low/no cost and capital intensive Facility Improvement Measures (FIMs) and ensuring their continued performance. The EBCx process assists in making the building systems perform interactively to meet the Current Facility Requirements (CFR) and provides the tools to support the continuous improvement of system performance over time. The EBCx process focuses on the dynamic energy-using systems with the goal of reducing energy waste, obtaining energy cost savings, and identifying and correcting existing problems. All phases of work including Planning, Investigation, Implementation and Turnover are anticipated to be complete March 2019.

L23114 Nevaldine North 119 - Rehab Mechanical Ventilation

This project is currently in Final Design / Bid Phase. The scope of work includes modifications to existing mechanical systems and ductwork to provide conditioned air to NN113, NN115 and NN119 which were recently updated to accommodate the new Game Design & Development program.

  • Project Schedule:
    • Bid Opening 5/9/18
    • Beneficial Occupancy / Construction Completion Date 8/3/18

L23124 Southworth Library - 1st Floor Interior Renovations

This project is currently in Conceptual Design Phase. The scope of work includes interior renovations of space including the front desk, offices and tutoring spaces on the 1st floor of Southworth Library. The Design Phase, Bid Phase and Construction Phase schedule is to be determined.

L23126 Southworth Library - Lower Level Interior Renovations

This project is currently in Design Phase. The scope of work includes interior renovations of space to accommodate office needs for Information Technology on the lower level of Southworth Library. Work is scheduled to be substantially complete August 2018.

L23127 Nevaldine South 133 - Repurpose Space for eSports

This project is currently in Design Phase. The scope of work includes interior renovations of space to accommodate eSports in Nevaldine South 133.

  • Project Schedule:
    • Bid Opening 5/23/18
    • Beneficial Occupancy / Construction Completion Date 8/3/18

L23129 Mohawk South Wing - Replace Floors

This project is currently in Design Phase. The scope of work includes removal and replacement of floor finishes in Mohawk South Wing including common areas and student rooms.

  • Project Schedule:
    • Pre-Bid Walk Through 4/27/18
    • Bid Opening 5/10/18
    • Beneficial Occupancy / Construction Completion Date 8/10/18

L23130 Kennedy Hall - Exterior Repairs

This project is currently in Design Phase. The scope of the project includes repair and replacement of exterior finishes, gutter systems and down spouts.

  • Project Schedule:
    • Pre-Bid Walk Through 5/22/18
    • Bid Opening 5/29/18
    • Beneficial Occupancy / Construction Completion Date 8/10/18

Projects in Request Phase (not listed in any particular order):

SUCF 231XXX Site Improvements French Hall

This project is being requested to remove and replace deteriorated pedestrian walks, stairs, rails, and stone veneer retaining walls north, south and east of French Hall toward Southworth Library.

SUCF 231XXX Replace Boilers - Cooper Service Complex

This project is being requested to remove and replace existing boilers and related systems due to age and failure with new energy efficient systems.

SUCF 231XXX Rehab Payson Hall

This project is being requested to renovate interior of Payson Hall, repurpose space, update technology, lighting, HVAC, mechanical, electrical and plumbing systems.

SUCF 231XXX Rehab Nevaldine Hall North

This project is being requested to renovate interior of Nevaldine Hall North, repurpose space, update technology, lighting, HVAC, mechanical, electrical and plumbing systems.